Herts. WithOut Waste (HertsWOW)

Recycling and composting not disposal

Blog

Eunomia's 12th Residual Waste Infrastructure Review

Posted by hertswow on September 13, 2017 at 11:20 AM

The Eunomia consultancy team has published their biannual Residual Waste Infrastructure Review. here

which "tracks and forecasts the UK’s supply of treatment capacity and available waste arisings. The 12th edition of the report highlights the significant growth in residual waste treatment capacity since Eunomia started tracking facility development in 2009.

The review finds that the UK has more than doubled its residual waste treatment capacity in this time, while the quantity of residual waste suitable for treatment has fallen by 13%, and forecasts that supply will exceed capacity in 2020/21. Were all planned facilities to operate at full capacity, this would limit the UK’s recycling rate to no more than 63%."

Categories: None

Post a Comment

Oops!

Oops, you forgot something.

Oops!

The words you entered did not match the given text. Please try again.

Already a member? Sign In

0 Comments